Preliminary Engineering Report
Page 1 of 1
Preliminary Engineering Report
The skeleton crew we have assembled thus far have been reviewing the construction of the ship. Not a single flaw or defect detected. Although, we won't be able to test the drive and warp cores until we depart. Even regarding those though, energy systems are operating flawlessly and components seem to be capable of handling nominal loads.
If you have anything to report regarding the electronics in the private cabins, please forward them to me at my private terminal.
Chief Engineer Azley signing off.
If you have anything to report regarding the electronics in the private cabins, please forward them to me at my private terminal.
Chief Engineer Azley signing off.
Azley- Posts : 2
Join date : 2016-01-15
Page 1 of 1
Permissions in this forum:
You cannot reply to topics in this forum
|
|